For designers, producers, assemblers, installers and sellers or users of pressure equipment.

Main steps taken by designated Inspection agency:

  • Preparation and document assessment;
  • Practical execution at the location of structure of the pressure equipment;
  • Report of results;
  • Decision on issuing a ( preliminary) statement for commissioning.

The evaluation for commissioning includes de following verifications and checks:

  • Verification of pressure equipment according to the manual and markings;
  • Checking the exterior conditions of the pressure equipment;
  • Checking the operation of the safety accessories and accessories under pressure;
  • Checking the structure of the pressure equipment.