Welcome to the Kiwa global website. Would you like more information about what Kiwa can offer you in the country you are
located? Please select your language.

United States
United States
English
  • +44 (0) 1332 383333
  • Stories
  • Careers
  • Contact us
EN - Global

Choose your country and language

  • Australia
    Australia English
  • Belgium
    Belgium Nederlands Français
  • China
    China 中文
  • Denmark
    Denmark Dansk
  • Estonia
    Estonia Eesti keel
  • Finland
    Finland Suomi
  • France
    France Français
  • Germany
    Germany Deutsch English
  • Italy
    Italy Italiano English
  • Korea
    Korea 한국어 English
  • Latin America
    Latin America Español Português
  • Latvia
    Latvia Latviešu Pусский
  • Lithuania
    Lithuania Lietuviškai Pусский
  • The Netherlands
    The Netherlands Nederlands English
  • Norway
    Norway Norsk
  • Poland
    Poland Polski
  • Portugal
    Portugal Português
  • Spain
    Spain Español
  • Sweden
    Sweden Svenska
  • Turkey
    Turkey Türkçe English
  • United States
    United States English
  • United Kingdom
    United Kingdom English
Kiwa logo Kiwa home
  • Services
    • Testing
    • Inspection
    • Certification
    • Consultancy
    • Training
    • Explore services
  • Markets
    • All markets
    • Automotive and Aviation
    • Construction and Infrastructure
    • Consumer Products
    • Cyber Security
    • Education and Training
    • Energy and Power Generation
    • Fire, Safety and Security
    • Food, Feed & Farm
    • Hazardous Materials
    • Industry Assets
    • Management Systems
    • Medical Devices
    • Mining
    • Oil, Gas and Chemicals
    • Process Industry
    • Radio, Wireless and Electrical Equipment
    • Real Estate Services
    • Tourism and Leisure
    • Transport and Mobility
    • Utilities
    • Water
  • Themes
    • All themes
    • ISO 27001 standard for information security
    • The transition to sustainable businesses
    • ISO 9001 Quality Management System
    • The Hydrogen Revolution
      • Hydrogen production processes
      • Hydrogen distribution and transportation
      • Hydrogen storage
      • Hydrogen Appliances and Fuel Cells
      • Hydrogen Mobility and Refueling stations
      • Hydrogen in industrial processes
    • Remote auditing
    • Cyber security: protect your data
    • FSSC 22000 food safety management system
    • Recycling
    • Supporting organizations through COVID-19
  • About Kiwa
    • About Kiwa
    • Mission and vision
    • Corporate Social Responsiblity
    • Kiwa Code of Conduct and Compliance
    • Management
    • Key figures
    • Careers
    • The Kiwa beaver
    • Quality labels
    • Accreditations and notifications
    • Terms, conditions and regulations
    • Head office locations
    • Part of SHV
    • Kiwa is member of the TIC-Council
  • Stories
  • Careers
  • Contact us
  • EN - Global
    • Australia
      Australia English
    • Belgium
      Belgium Nederlands Français
    • China
      China 中文
    • Denmark
      Denmark Dansk
    • Estonia
      Estonia Eesti keel
    • Finland
      Finland Suomi
    • France
      France Français
    • Germany
      Germany Deutsch English
    • Italy
      Italy Italiano English
    • Korea
      Korea 한국어 English
    • Latin America
      Latin America Español Português
    • Latvia
      Latvia Latviešu Pусский
    • Lithuania
      Lithuania Lietuviškai Pусский
    • The Netherlands
      The Netherlands Nederlands English
    • Norway
      Norway Norsk
    • Poland
      Poland Polski
    • Portugal
      Portugal Português
    • Spain
      Spain Español
    • Sweden
      Sweden Svenska
    • Turkey
      Turkey Türkçe English
    • United States
      United States English
    • United Kingdom
      United Kingdom English
  • Services
  • Markets
  • Themes
  • About Kiwa
Request quote
Services

  • Testing
  • Inspection
  • Certification
  • Consultancy
  • Training
  • Explore services
Markets

  • All markets
  • Automotive and Aviation
  • Construction and Infrastructure
  • Consumer Products
  • Cyber Security
  • Education and Training
  • Energy and Power Generation
  • Fire, Safety and Security
  • Food, Feed & Farm
  • Hazardous Materials
  • Industry Assets
  • Management Systems
  • Medical Devices
  • Mining
  • Oil, Gas and Chemicals
  • Process Industry
  • Radio, Wireless and Electrical Equipment
  • Real Estate Services
  • Tourism and Leisure
  • Transport and Mobility
  • Utilities
  • Water
Themes

  • All themes
  • ISO 27001 standard for information security
  • The transition to sustainable businesses
  • ISO 9001 Quality Management System
  • The Hydrogen Revolution
  • Remote auditing
  • Cyber security: protect your data
  • FSSC 22000 food safety management system
  • Recycling
  • Supporting organizations through COVID-19
About Kiwa

  • About Kiwa
  • Mission and vision
  • Corporate Social Responsiblity
  • Kiwa Code of Conduct and Compliance
  • Management
  • Key figures
  • Careers
  • The Kiwa beaver
  • Quality labels
  • Accreditations and notifications
  • Terms, conditions and regulations
  • Head office locations
  • Part of SHV
  • Kiwa is member of the TIC-Council
  1. Service
  2. Testing
  3. Remediation Method Statements

Remediation Method Statements

Remediation Method Statements and Watching Brief (Stages 2 and 3 LCRM – remediation feasibility and development of a final remediation strategy)

Following on from the preliminary Phase 1 Desk Study and Phase 2 Intrusive Investigation there may be a requirement for a site to be remediated to enable it to be suitable for use with regard to human health or other risks posed to other sensitive environmental receptors.

Request quote Download PDF

The Phase 2 report is likely to contain a number of remedial options but the process of providing a Remediation Method Statement involves the necessary authorities and this document details out the necessary steps that are required in order to return a parcel of land to be suitable for its end use. The works carried out in line with this will normally require a verification process.
The Land Contamination Risk Management (EA, 2020) guidance Stage 2 and 3 processes also include a remediation options appraisal and any required process to be detailed in a Remediation Method Statement.
Remediation of a site may be a simple single stage or a more complex multi-stage process which can also include several reporting stages:

  • Liaison with Local Planning Authority Environmental Health Officer
    Agreement of procedures and required scopes
  • Scrutiny of data for imported materials (e.g. topsoils, subsoils)
  • A watching brief for material to be removed
  • Various site visits to test stockpiled materials that have been or are to be imported or site-won materials that are intended for re-use
  • Assessment of the proposed layouts and modification of these in order to mitigate risks posed by the site/to receptors
  • Installation of various mitigating measures (e.g. incorporation of hydrocarbon or other gas resistant membranes, capping, etc.)

The works carried out in line with this will normally require a verification process.

What is the output?

The output is a conceptual model review in a report that essentially shows the levels of risk and how they are reduced by implementation of the remediation techniques involved.

How are the reports presented?

Our reports are provided in PDF format via email.

Interested?

Kiwa CMT
Request quote +44 (0) 1332 383333
Kiwa N.V.
Request quote +31 (0)88 998 44 00

Related Products

  • Verification of Remediation

    Verification of Remediation Site Works and Reporting (Stage 3 LCRM – verification and future works)
    Show
  • Site Investigation

    Kiwa CMT | We provide a range of ground investigation services
    Show
  • Waste and Contamination

    Kiwa CMT | Construction materials, geotechnical, structures and waste testing.
    Show
Kiwa: We create trust

We are Kiwa. With our certification, inspection, testing, training and consultancy services, we create trust in our customers' products, services, processes, (management) systems and employees.

Services
  • Testing
  • Inspection
  • Certification
  • Training
  • Consultancy
Contact us
  • Send us your message

Follow us:

  •  
  •  
  • Disclaimer
  • Cookie policy
  • Responsible disclosure policy
  • Beware of fake Kiwa certificates in China
  • Privacy Policy