Solar panels in a photovoltaic power plant with monitoring equipment and a dirt access road at sunset.

Performance Ratio (PR) Validation

Kiwa PI Berlin reviews O&M procedures during the operational phase to verify that the photovoltaic plant achieves the required Performance Ratio (PR). In addition, recommendations are provided to support the long-term achievement of the expected energy yield.

Receive a quote tailored to your needs