This website uses cookies

Kiwa uses three types of cookies on its website. We do this to make your website visit as pleasant as possible. Read more about our cookie policy.

You can indicate below what kind of cookies we may use.

Please indicate your preferences
Necessary cookies
Analytical cookies
Marketing cookies
I agree
  • +44 (0)1242 677877
  • About Kiwa
  • Careers
  • Contact
UK - English

Choose your country and language

  • Global
    Global English
  • Belgium
    Belgium Nederlands Français
  • China
    China 中文
  • Denmark
    Denmark Dansk
  • Estonia
    Estonia Eesti keel
  • Finland
    Finland Suomi
  • France
    France Français
  • Germany
    Germany Deutsch English
  • Italy
    Italy Italiano English
  • Korea
    Korea 한국어 English
  • Latin America
    Latin America Español Português
  • Latvia
    Latvia Latviešu Pусский
  • Lithuania
    Lithuania Lietuviškai
  • The Netherlands
    The Netherlands Nederlands English
  • Norway
    Norway Norsk
  • Poland
    Poland Polski
  • Portugal
    Portugal Português
  • Spain
    Spain Español
  • Sweden
    Sweden Svenska
  • Turkey
    Turkey Türkçe English
  • United Kingdom
    United Kingdom English
Kiwa logo
  • Services
    • Testing
    • Inspection
    • Certification
    • Training
    • Consultancy
    • Explore services
  • Markets
    • All markets
    • Agri, Feed, Food
    • Automotive and Aviation
    • Building Materials
    • Construction and Infrastructure
    • Consumer Products
    • Energy
    • Fire, Safety and Security
    • Hazardous Materials
    • Management Systems
    • Manufacturing
    • Medical Devices
    • Oil, Gas and Chemicals
    • Process Industry
    • Real Estate Services
    • Retail
    • Tourism and Leisure
    • Training
    • Transport and Mobility
    • Utilities
    • Water
  • Media
    • News
      • Latest news
      • 2021
      • 2020
      • 2019
      • 2018
    • Press
    • Video
    • Corporate Brochures
  • Downloads
  • Areas of expertise
  • About Kiwa
  • Careers
  • Contact
  • UK - English
    • Global
      Global English
    • Belgium
      Belgium Nederlands Français
    • China
      China 中文
    • Denmark
      Denmark Dansk
    • Estonia
      Estonia Eesti keel
    • Finland
      Finland Suomi
    • France
      France Français
    • Germany
      Germany Deutsch English
    • Italy
      Italy Italiano English
    • Korea
      Korea 한국어 English
    • Latin America
      Latin America Español Português
    • Latvia
      Latvia Latviešu Pусский
    • Lithuania
      Lithuania Lietuviškai
    • The Netherlands
      The Netherlands Nederlands English
    • Norway
      Norway Norsk
    • Poland
      Poland Polski
    • Portugal
      Portugal Português
    • Spain
      Spain Español
    • Sweden
      Sweden Svenska
    • Turkey
      Turkey Türkçe English
    • United Kingdom
      United Kingdom English
  • Services
  • Markets
  • Media
  • Downloads
  • Areas of expertise
Services

  • Testing
  • Inspection
  • Certification
  • Training
  • Consultancy
  • Explore services
Markets

  • All markets
  • Agri, Feed, Food
  • Automotive and Aviation
  • Building Materials
  • Construction and Infrastructure
  • Consumer Products
  • Energy
  • Fire, Safety and Security
  • Hazardous Materials
  • Management Systems
  • Manufacturing
  • Medical Devices
  • Oil, Gas and Chemicals
  • Process Industry
  • Real Estate Services
  • Retail
  • Tourism and Leisure
  • Training
  • Transport and Mobility
  • Utilities
  • Water
Media

  • News
  • Press
  • Video
  • Corporate Brochures
  1. Products
  2. Remediation Method Statements

Remediation Method Statements

Remediation Method Statements and Watching Brief (Stages 2 and 3 LCRM – remediation feasibility and development of a final remediation strategy)

Following on from the preliminary Phase 1 Desk Study and Phase 2 Intrusive Investigation there may be a requirement for a site to be remediated to enable it to be suitable for use with regard to human health or other risks posed to other sensitive environmental receptors.

Request information Download PDF

The Phase 2 report is likely to contain a number of remedial options but the process of providing a Remediation Method Statement involves the necessary authorities and this document details out the necessary steps that are required in order to return a parcel of land to be suitable for its end use. The works carried out in line with this will normally require a verification process.
The Land Contamination Risk Management (EA, 2020) guidance Stage 2 and 3 processes also include a remediation options appraisal and any required process to be detailed in a Remediation Method Statement.
Remediation of a site may be a simple single stage or a more complex multi-stage process which can also include several reporting stages:

  • Liaison with Local Planning Authority Environmental Health Officer
    Agreement of procedures and required scopes
  • Scrutiny of data for imported materials (e.g. topsoils, subsoils)
  • A watching brief for material to be removed
  • Various site visits to test stockpiled materials that have been or are to be imported or site-won materials that are intended for re-use
  • Assessment of the proposed layouts and modification of these in order to mitigate risks posed by the site/to receptors
  • Installation of various mitigating measures (e.g. incorporation of hydrocarbon or other gas resistant membranes, capping, etc.)

The works carried out in line with this will normally require a verification process.

What is the output?

The output is a conceptual model review in a report that essentially shows the levels of risk and how they are reduced by implementation of the remediation techniques involved.

How are the reports presented?

Our reports are provided in PDF format via email.

Related Products

  • Verification of Remediation

    Verification of Remediation Site Works and Reporting (Stage 3 LCRM – verification and future works)
    Show
  • Site Investigation

    Whether it be for contamination, geotechnical profiling, coal authority rotary boreholes, trial pitting, etc. we can help you achieve your technical goals. Our dedicated and qualified teams are only a telephone call away, so whatever your requirements, large or small, we are ready to help you deliver.
    Show
  • Soil Testing

    The BS3882 topsoil suite is specifically designed to categorise grades of topsoil based on physical and chemical composition.
    Show
  • Gas Membrane Validation

    Certified validation of the installation process of a membrane suitable for preventing ground gases from entering a building.
    Show
  • Waste

    Kiwa CMT | Construction materials, geotechnical, structures and waste testing.
    Show
Useful links
  • KUKreg4 Approved Products List
  • TMV Certificate Database
  • BDA Agrément Database
  • Cavity Wall/Loft Installer Certificate Database
  • RHI Approved Heat Meters
Services
  • Testing
  • Inspection
  • Certification
  • Training
  • Consultancy
Contact us
uk.service@kiwa.com
  • Disclaimer
  • Cookie policy
  • Responsible disclosure policy
  • Modern Slavery Statement
  • Privacy Policy
  • Ts & Cs
  • Vacancies