Visual Verification of Utilities (Hydro-Vac Excavation)
Receive a quote tailored to your needs
What is Visual Verification of Utilities and what it includes
Kiwa T2’s Utility Daylighting uses non-destructive hydrovac excavation to safely expose underground utilities, providing precise confirmation of utility locations prior to design, excavation, or construction.
Rather than starting with blind hydro-excavation, T2ue uses geophysics upfront to pinpoint utilities before test hole excavation begins. We provide a turn-key solution to cut, vacuum, and restore surfaces to like-new conditions, minimizing disruption and ensuring a clean, professional finish.
Daylighting deliverables can be issued as standalone reports or integrated into Utility Engineering drawings, GIS platforms, and 3D utility models for seamless coordination.
Who is it for?
This service is ideal for engineering consultants, construction contractors, utility owners, municipalities, and infrastructure asset managers who require accurate utility information for planning, design, construction, maintenance, and asset management activities. It is particularly valuable where existing utility information must be verified through direct field observation to reduce risk and improve data accuracy.
Benefits of Visual Verification of Utilities
- Accurate utility records and mapping
- Reduced project risk and uncertainty
- Improved design and construction planning
- Validation of utility asset information
- Fewer utility conflicts and costly surprises
- Better decision-making through field-verified data
Why Choose Kiwa?
Kiwa T2 brings together utility engineering, geophysical, and geospatial expertise to improve the accuracy and efficiency of utility verification programs. Unlike approaches that rely on blind excavation, our team uses utility engineering knowledge, and advanced geophysical investigation techniques to pre-mark utilities before excavation or exposure activities begin. This targeted approach increases the likelihood of successfully exposing utilities, reduces unnecessary test holes, minimizes disruption, and provides clients with more accurate and reliable utility information for planning, design, construction, and asset management.
Process
Review Existing Information
Collect and review available utility records, drawings, and project information.
Utility Investigation & Pre-Marking
Where necessary, apply utility engineering, geophysical, and geospatial expertise to identify and pre-mark likely utility locations.
Field Verification
Expose and visually verify utilities to confirm asset characteristics and configuration.
Data Collection & Documentation
Record verified utility information, photographs, measurements, and observations.
Reporting & Deliverables
Provide verified utility data, mapping updates, and supporting documentation for project use.
Applicable Norms or Regulations
ASCE 38 standards for utility engineering and verification
Best practices for utility safety and documentation
As Built Documentation (ASCE 75/CSA S250)
Professional support for accurate as-built documentation, ensuring compliance with ASCE 75 or CSA S250 standards for engineering and construction projects.
Public Locate Project Management
Comprehensive management of public utility locate projects, ensuring safe excavation, regulatory compliance, and efficient project delivery.
Marker Ball Installations
Simplify future utility locating and verification by installing marker balls on difficult-to-detect underground infrastructure.
Private Locates
Identify and mark privately owned underground utilities before excavation, construction, or site development activities begin.
Subsurface Utility Engineering (SUE) Investigations (ASCE 38)
Professional investigation and analysis of above-ground and underground utilities to provide reliable utility information following the ASCE 38 that supports safer, more informed project planning and design.
Utility Mapping (ASCE 38 not requested)
Accurate utility data tailored to your project needs, helping you understand existing infrastructure and manage risk without the scope of a full SUE investigation.
Utility Coordination
Utility impacts and relocations present significant risks to infrastructure project delays. T2 Utility Engineers Utility Coordination professionals develop a managed approach to identify and guide the complex utility conflict resolution process, working closely with myriad utility system owners so construction can progress smoothly.
Underground Storage Tank Investigations
Identify potential underground storage tanks with confidence using non-invasive Ground Penetrating Radar (GPR) investigations that help reduce uncertainty and support informed property decisions.