1 March 2023

Draft BRL K17201, parts 1 and 2 published for comments

The revised draft-evaluation guideline BRL K17201, parts 1 and 2 for the renovation of drinking water piping systems with cured-in-place pipe technology (factory impregnated liner systems) has been published for comments.

BRL K17201, part 1 for the renovation of drinking water pipes - Part 1 – Design and Installation of Cured-in-Place Pipe (CIPP) – Factory Impregnated Liner Systems

BRL K17201, part 2 for the Kiwa-(technical-approval-with) product certificate for the renovation of drinking water piping systems – part 2 – Products for cured in place pipes (CIPP) – factory impregnated liner systems

In the BRL K17201, parts 1 and 2, the following updates have been implemented:

BRL K17201, part 1

    • In accordance with the new (Dutch) Kiwa template, several general texts have been updated;
    • Reference to and harmonisation with the (new) EN-ISO 11298, parts 1 and 4 regarding the product requirements and ISO/TS 23818, part 2 regarding conformity assessment aspects.

BRL K17201, part 2

    • In accordance with the new (Dutch) Kiwa template, several general texts have been updated.

If you have any comment in relation to the changes in the BRL, then please use the comment sheet as included in this email. Comments can be sent to Hans den Boer (email: hans.den.boer@kiwa.com) till 15 April 2023.

Downloads